Showing posts with label Construction Site. Show all posts
Showing posts with label Construction Site. Show all posts

Clementi Mall - Under Construction

Hey hey hey, it has been two years since I posted this . I've predicted that " Clementi is doom for the next 2 years. " But ap...

Works in Jurong

Jurong East Modification Project (JEMP) From my home to Jurong East station. I hate it when there is no illustration nor project signboards ...

Confined to the office

There's some good and some bad. Good is I don't have to suffer under the sun. Bad is there is actually a lot more paper work to be d...

Jurong East Modification Project (JEMP)

This is an old news. Expanding Capacity for a Shorter Waiting Time LTA, 11/07/2008, http://app.lta.gov.sg/corp_press_content.asp?start=1964 ...

Excavation in Progress

Is there any geotechnical engineer who can tell me what is this machine for? Every day I see it dripping with mud and threatening to bite of...

Iluma & Carlton

市区。 不能太久没有去。 不然会发现,该在的,不见了。 陌生的,通通从地面钻了出来。 Carlton Hotel Extension Iluma @ Bugis WOHA 的最新力作。名字取得好像 Dan Brown 小说里的邪教。而且隔了两条街,它像在呼应着较早前 RSP Ar...

Upper Cross Street MRT

It is the end of my 6th month at Upper Cross Street. And how was it celebrated? The Upper Cross Street MRT station retaining wall constructi...

Yishun Library

After smelling soil and chatting with contractors under the scorching sun and thunderstorm for the past month, I can finally enjoy a comfort...

April Sum-up

Watched 3 movies in March and 1 today. Three were rather impulsive, as in I went to watch them alone. And I was glad that I’ve watched them....

Random II

Update on the Clementi Hub construction. November 2006 June 2007 March 2008 Far future Damn they are slow! Clementi is doom for the next 2 y...
 

©Copyright 2011 d0uble-o-fish | TNB