step 2: brainstorm on 1 or 2 materials that are easy to cut and join to form the proposed model

step 3: mass production (of the terrace steps)

step 4: glue the components (terrace steps) together

step 5: assembly

step 6: construction of the staircases
Note: due to the scale of model, the details of each steps are conveniently represented as slopesstep 7: joining of the terrace and the staircases

step 8: completion of the terrace

step 9: cover the top of the pyramid and addition of the temple block

(the truth underneath, again)

(the real "el castillo")


0 comment:
Post a Comment